"2020 was a highly successful and pivotal year for the Company, having seen our flagship Hellyer operations finally achieve production rates better than originally forecast from the original mine start-up plan. Hellyer's year end performance, and the revenue boosts associated with production rates of around 1.4 million tonnes per annum, were instrumental in securing a major
Hellyer Operations Update:
Table 1: Hellyer Production Results by Quarter for 2020 and Full Year
Reconciled Production | Q4 2020 | Q3 2020 | Q2 2020 | Q1 2020 | Full Year 2020 |
Lead Concentrate (tonnes) | 9,565 | 11,865 | 8,762 | 8,127 | 38,319 |
Zinc Concentrate (tonnes) | 5,583 | 4,585 | 4,241 | 4,609 | 19,019 |
2020 saw consistently improving production output at Hellyer, driven by a systematic plan that increased capacity at the plant to around 1.4 million tonnes per annum (mtpa) by year end. This throughput compares to the initial project steady state forecast of 1.2 mtpa and a revised throughput target of 1.5 mtpa planned for the end of Q1 2021. In addition, the Company completed its
Overall production for the 2020 comprised:
· Lead concentrates of 38,319 tonnes - up 53% from the previous year (2019 FY: 24,980 tonnes).
· Zinc concentrates of 19,019 tonnes - up 22% from the previous year (2019 FY: 15,646 tonnes).
Payable gross gold production for 2020 was 5,452 ounces and payable gross silver production was 1,106,440 ounces. These saleable precious metals reported to the lead and zinc concentrates.
Major New Hellyer Tailings Construction Project:
The long-term mining and processing plan called for the construction of a new tailings dam at the Hellyer operations. This new tailings dam (TSF2) will service the existing life-of-mine operations from the tailings retreatment project. In addition, this new dam will provide for additional tailings storage capacity in the emptied TSF1 dam for a potential re-opening of the Hellyer underground mining operations, where significant high-grade mineralisation still exists, as previously reported.
Construction of TSF2 commenced at Hellyer in Q4. Tailings deposition into Stage 1 of the new TSF2 is scheduled to start around the end of Q1 2021.The capital cost of Stage 1 TSF2, when completed, will be around Australian
Figure 1: The new TSF2 tailings storage area under construction at Hellyer may be viewed via the following link: http://www.rns-pdf.londonstockexchange.com/rns/4445L_1-2021-1-12.pdf
Hellyer Reserves and Resources Update:
Independent consultants CSA Global (UK) Limited have completed a revised competent person's report (CPR) about Hellyer, dated 19/11/2020. The revised CPR includes an updated Mineral Resource and Ore Reserve estimate taking into account the depletion by way of mining and processing of 1,679,676 tonnes since the publication of the previous CPR dated
Table 2: Hellyer Mineral Resource Estimate (CSA Global CPR (2017) depleted to end
JORC Classification | Gross | Net Attributable to Operator (NQ) | ||||||||||
Tonnage (Mt) | Zn % | Pb % | Ag | Au | Cu % | Tonnage (Mt) | Zn % | Pb % | Ag | Au | Cu % | |
Measured | 1.55 | 3.44 | 3.45 | 98 | 2.71 | 0.2 | 1.55 | 3.44 | 3.45 | 98 | 2.71 | 0.2 |
Indicated | 4.82 | 2.31 | 2.97 | 95 | 2.57 | 0.18 | 4.82 | 2.31 | 2.97 | 95 | 2.57 | 0.18 |
Inferred | 1.21 | 1.00 | 2.60 | 86 | 2.57 | 0.19 | 1.21 | 1.00 | 2.60 | 86 | 2.57 | 0.19 |
Total | 7.57 | 2.33 | 3.01 | 94 | 2.60 | 0.19 | 7.57 | 2.33 | 3.01 | 94 | 2.60 | 0.19 |
Note: No lower cut-off reporting grade has been applied. Differences may occur due to rounding. Datamine model: hel717md.dm.
Table 3: Hellyer, Mineral Resource Estimate - metal tonnes and ounces, gross total only, all attributable to NQM (CSA Global CPR (2017) depleted to end
JORC |
| |||||
Tonnage | Zn (t) | Pb (t) | Ag (oz) | Au (oz) | Cu (t) | |
Measured | 1,550,000 | 53,300 | 53,400 | 4,893,400 | 135,00 | 3,100 |
Indicated | 4,820,000 | 111,300 | 143,000 | 14,634,500 | 398,600 | 8,600 |
Inferred | 1,210,000 | 12,100 | 31,500 | 3,345,600 | 100,000 | 2,300 |
Total | 7,570,000 | 176,700 | 228,000 | 22,873,600 | 633,600 | 14,000 |
Note: Metal tonnages and ounces rounded from calculated values.
Table 4: Hellyer TSF Ore Reserve Estimate (CSA Global CPR (2017) depleted to end
|
| Gross | |||||||||
|
| Grade | Contained Metal | ||||||||
| Tonnage | Zn % | Pb % | Ag g/t | Au g/t | Cu % | Zn (t) | Pb (t) | Ag (oz) | Au (oz) | Cu (t) |
Proven | 1.55 | 3.44 | 3.45 | 98 | 2.71 | 0.21 | 53.3 | 53.4 | 4,893 | 135 | 4.3 |
Probable | 4.82 | 2.31 | 2.97 | 95 | 2.57 | 0.18 | 111.3 | 143.0 | 14,634 | 398 | 8.6 |
Total | 6.37 | 2.58 | 3.09 | 96 | 2.60 | 0.19 | 164.6 | 196.4 | 19,527 | 533 | 12.9 |
|
| Net Attributable to Operator (NQ) | |||||||||
|
| Grade | Contained Metal | ||||||||
| Tonnage | Zn % | Pb % | Ag g/t | Au g/t | Cu % | Zn (t) | Pb (t) | Ag (oz) | Au (oz) | Cu (t) |
Proven | 1.55 | 3.44 | 3.45 | 98 | 2.71 | 0.21 | 53.3 | 53.4 | 4,893 | 135 | 4.3 |
Probable | 4.82 | 2.31 | 2.97 | 95 | 2.57 | 0.18 | 111.3 | 143.0 | 14,634 | 398 | 8.6 |
Total | 6.37 | 2.58 | 3.09 | 96 | 2.60 | 0.19 | 164.6 | 196.4 | 19,527 | 533 | 12.9 |
Note: Mt and Zn, Ag, Au and Cu grades are rounded to two decimal places, Ag to the nearest whole number. Contained metal tonnes are reported to nearest hundred, and ounces to nearest thousand tonnes.
CSA Global, as part of their CPR and Ore Reserve estimate, also calculated that the NPV10 of Hellyer's tailings reprocessing activity is
Table 5: Market Assumptions used in Hellyer Reserve NPV (CSA Global
Year | Gold | Silver | Zinc | Lead |
2020 | 1,929 | 24.21 | 2,259 | 1,861 |
2021 | 1,977 | 24.49 | 2,260 | 1,894 |
2022 | 1,847 | 21.33 | 2,276 | 1,930 |
2023 | 1,762 | 20.26 | 2,311 | 1,937 |
2024 | 1,672 | 19.75 | 2,371 | 1,926 |
2025 | 1,733 | 21.02 | 2,575 | 2,078 |
2026 | 1,733 | 21.02 | 2,575 | 2,078 |
2027 | 1,733 | 21.02 | 2,575 | 2,078 |
Note: Source Consensus Economics (www.consensuseconomics.com)
The revised CPR is available on the Company's website and can be accessed at: https://www.nqminerals.com/important-documents/
Beaconsfield Gold Mine Update:
NQ has commissioned independent consultants Pitt & Sherry in
On the metallurgical front, detailed carbon loading analysis for the gold stripping circuit are awaited to finalise the full plant refurbishment and start-up costs and schedule.
Now that the Hellyer debt refinancing has been completed; the Company's focus will switch to getting Beaconsfield into gold production.
Competent Person's Statement
The information in this report that relates to the Hellyer project is based on information compiled by Mr.
-END-
About NQ Minerals
NQ Minerals Plc is listed on
NQ Minerals operations are in
For more information, please contact:
NQ Minerals plc
Media Enquiries
IFC Advisory Limited
graham.herring@investor-focus.co.uk
Tel: +44 (0) 203 934 6630 (
Corporate Adviser
First Sentinel Corporate Finance Limited
Tel: +44 (0) 207 183 7407 (
Corporate Broker
VSA Capital Limited
+ 44 (0) 203 005 5000 (
The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Upon the publication of this announcement via a Regulatory Information Service, this inside information is now considered to be in the public domain.
The Following section relates to NQ Minerals Plc's news releases distributed in
Cautionary Note to US Investors
The United States Securities and Exchange Commission ("SEC") permits US Mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Any estimates of mineral resources shown in this press release or on NQ Minerals PLC's website have been prepared in accordance with definition standards of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves produced by the Australasian Joint Ore Reserves Committee, which may differ from definition standards of the United States Securities and Exchange Commission ("SEC") Industry Guide 7. The Company may use certain terms which the SEC guidelines strictly prohibit US registered companies from including in their filings with the SEC.
Cautionary Note Regarding Forward-Looking Statements
This press release may contain "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Such statements include, but are not limited to, any statements based on current expectations, estimates, forecasts, and projections, including those related to our growth strategy, mineral estimates and any other statements that are not historical facts. Forward-looking statements are based on management's current expectations and are subject to risks and uncertainties that could negatively affect our business, operating results, financial condition, and stock price. Factors that could cause actual results to differ materially from those currently anticipated are risks related to our growth strategy; risks relating to exploration, development and/or extraction; our ability to obtain, perform under, and maintain financing and strategic agreements and relationships; our ability to attract, integrate, and retain key personnel; global demand for mineral resources; our need for substantial additional funds; government regulation; as well as other risks. The Company expressly disclaim any obligation or undertaking to release publicly any updates or revisions to any forward-looking statements contained herein to reflect any change in our expectations or any changes in events, conditions, or circumstances on which any such statement is based, except as required by law.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
NO INVESTMENT ADVICE
The Company is a publisher. You understand and agree that no content published on the Site constitutes a recommendation that any particular security, portfolio of securities, transaction, or investment strategy is...
FOR OUR FULL DISCLAIMER CLICK HERE